Check early. Avoid problems later.
The best time to solve a problem is before it reaches your project site.
At AQ Electric, we offer Factory Acceptance Testing (FAT) to ensure your critical solar components meet the highest standards—before they ever leave the factory.
From PV modules and inverters to switchgear and transformers, our engineers conduct a complete evaluation to catch issues early and save you time, cost, and stress later.
What we do during FAT:
– Visual & Mechanical Inspection – Spotting physical defects and ensuring structural integrity.
– Standard Compliance Check – Verifying conformity with IEC, UL, and other global standards.
– Performance Testing – Evaluating equipment behavior under expected operational conditions.
– Defect Identification & Reporting – Delivering a detailed report to resolve non-compliance before shipment.
Prevention is always smarter than correction. Let AQ Electric help you build solar systems with confidence and quality—starting at the factory.